Tinuvin® 5151 is a liquid blend of a hydrophilic 2-(2-hydroxyphenyl)-benzotriazole UV absorber (UVA) and a basic hindered amine light stabilizer (HALS) designed to fulfill high cost/performance and durability requirements of exterior industrial and decorative coatings. The broad UV absorbance of the used UVA of Tinuvin® 5151 makes it suitable for a wide range of coatings for wood, plastics and metal.
Tinuvin 5151 0,1KG Tinuvin® 5151 is a liquid blend of a hydrophilic 2-(2-hydroxyphenyl)-benzotriazole UV absorber (UVA) and a basic hindered amine light stabilizer (HALS) designed to fulfill high cost/performance and durability requirements of exterior industrial and decorative coatings. The broad UV absorbance of the used UVA of Tinuvin® 5151 makes it suitable for a wide range of coatings for wood, plastics and metal.
- Packaging
- 0,1KG PE-Can
- KG
- Order Steps
- 0.1
Product Attributes
| Name | Value | Unit |
|---|---|---|
|
Flash point |
120 - 120 |
°C |
|
Form |
liquidviscous |
|
|
Density |
1.105 - 1.105 |
g/cm³ |
Industry
- Coatings
Subindustry
- Industrial Coatings
- Automotive Coatings
- Furniture & Flooring Coatings
Application
- Automotive Additives
- Furniture & Flooring Additives
- Industrial Additives
Standard Lead Time
*Valid only for products which have the status "available" and for goods sent from our central warehouse subject to availability of stock. For products with status "limited availability" you will get more detailed information about lead time after order entry.
| Country | Standard Lead Time |
|---|---|
| 4-6 working days | |
| Portugal | 9-11 working days |
| Greece | 6-22 working days |
| Austria | 2-5 working days |
| Latvia | 6-8 working days |
| Netherlands | 5-10 working days |
| Sweden | 5-8 working days |
| Ireland | 10-14 working days |
| Luxembourg | 5-10 working days |
| Poland | 4-6 working days |
| Slovakia | 5-7 working days |
| Slovenia | 5-7 working days |
| Bulgaria | 7-10 working days |
| France | 7-10 (12 to Corse) working days |
| Lithuania | 6-8 working days |
| Serbia | 5-7 working days |
| Croatia | 5-7 working days |
| Romania | 7-10 working days |
| Hungary | 5-7 working days |
| United Kingdom | 7-10 working days |
| Switzerland | 2-4 working days |
| Spain | 5-7 (20 to Canaries) working days |
| Belgium | 5-10 working days |
| Norway | 4-8 working days |
| Finland | 5-8 working days |
| Denmark | 4-5 working days |
| Italy | 4-10 working days |
| Czech | 5-7 working days |
| Israel | 21-28 working days |
| Estonia | 6-8 working days |